ISOLA DEL TRONCHETTO, VENICE – StercheleGroup has just completed the assembly of the structures for the Hampton by Hilton hotel, the first to be built from scratch in Venice and one of the largest in the city.
The 3-star hotel will offer 324 rooms, a bar and restaurant, two conference rooms, a fitness center, and a dedicated workspace for professionals.
The building was constructed using the PREM System and 324 StercheleGroup bathroom pods, installed simultaneously with the floor structures. This significantly accelerated the construction process, allowing the structure to be assembled in just 104 days.