
Bathroom Pods and PREM System by StercheleGroup for the Largest Hotel in Venice
StercheleGroup has completed the installation of the structures for the Hampton by Hilton hotel, the first hotel built from the ground up in Venice and one of the largest in the city.
The 3-star hotel will offer 324 rooms, a bar and restaurant, two conference rooms, a fitness center, and a dedicated workspace for professionals.
The building was constructed using the PREM System and 324 StercheleGroup bathroom pods, installed simultaneously with the floor slabs. This approach significantly accelerated construction operations, allowing the structural assembly to be completed in just 104 days.