What is the procedure for positioning a bathroom pod on the construction site?

The prefabricated bathroom pod can be positioned from above (before each floor slab) during the construction of the building, or from the side (horizontally through rolling) once the building’s structural frame is completed and before starting the installation of the external walls and systems.